It has to look worse before it looks better.

 In almost every project we have a moment where reality hits and we recognize that things have to look worse or get messier before they get better. Our renovation of  The Market on Main has hit this phase and hit it hard.

The main level is mostly devoted to retail space and we have a BIG dream to be open this fall. This means that we need to remove and replace the floor. We also want to install a geothermal heating/cooling system, which includes elements in the floor. So, it goes something like remove the floor, form it for concrete, install the geothermal elements, run conduit for the electrical, pour the concrete floor, and then on to windows, doors and other finishes. Did I mention that the floor needs serious re-leveling? There is a difference of about 10 inches from the front to the back of the space.

Progress has been made! We have moved two supports, including the very cool architectural beam. And, as of today, all of the old floor is removed!
 This photo was shortly before all of the concrete was removed. Our contractor had to pour new footings for the structural beams.
The architectural beam is not original to the building, but was installed by the previous owner. We moved it to accommodate our plans for the space.
 Progress, beautiful progress! The old concrete is all removed and the grade is being reworked for the new floor plan. Exciting times!